Customise Consent Preferences

We use cookies to help you navigate efficiently and perform certain functions. You will find detailed information about all cookies under each consent category below.

The cookies that are categorised as "Necessary" are stored on your browser as they are essential for enabling the basic functionalities of the site. ... 

Always Active

Necessary cookies are required to enable the basic features of this site, such as providing secure log-in or adjusting your consent preferences. These cookies do not store any personally identifiable data.

Functional cookies help perform certain functionalities like sharing the content of the website on social media platforms, collecting feedback, and other third-party features.

No cookies to display.

Analytical cookies are used to understand how visitors interact with the website. These cookies help provide information on metrics such as the number of visitors, bounce rate, traffic source, etc.

No cookies to display.

Performance cookies are used to understand and analyse the key performance indexes of the website which helps in delivering a better user experience for the visitors.

No cookies to display.

Advertisement cookies are used to provide visitors with customised advertisements based on the pages you visited previously and to analyse the effectiveness of the ad campaigns.

No cookies to display.

Our Services

Construction Phase Fire Safety Assurance

FirePrevent provide construction phase monitoring, remediation works consultancy, fire safety defect identification reports and detailed fire safety design reviews.

Fire Engineering Support

This is a service that we offer during the construction phase of a building, between RIBA stages 4 and 6 or during remediation works on a development where fire safety issues have been highlighted.

Our construction phase fire safety assurance services provide our clients with significant levels of comfort that the intent of the original fire safety design has been monitored and inspected prior to handover.

We can expertly review internal fire precautions (active and passive) and external wall cladding systems, with the aim of protecting life safety and reducing any commercial risks for our clients.

Get in touch
man conducting fire safety checks

What our customers say

White Hindle and Partners Ltd utilise the skills of FirePrevent Ltd for their fire engineering requirements on many mid and high rise remediation schemes and CIF Education sectors. FirePrevent Ltd offer a cost effective and holistic approach to fire engineering and design and have been very pro-active in their services and deliveries. We wouldn’t hesitate to use their services in the future.

White Hindle and Partners Ltd

Our recent projects

Construction Phase Fire Safety Support

Aspect 14, Leeds

A residential development of 262 private apartments. Intrusive investigations and subsequent remediation works were undertaken on external cladding systems. The terracotta tile cladding system was removed and replaced with a similar system, which incorporated non-combustible insulation and cavity barriers in the necessary locations

Construction Phase Fire Safety Support

Bauhaus, Manchester

A residential development of 64 private apartments. Intrusive investigations and subsequent remediation works were undertaken on external cladding systems. All cladding systems on the external walls were removed and re-instated including the masonry brickwork system. Due to the way the existing building was poorly constructed, this was a complex project from high level design all the way to final construction.

Construction Phase Fire Safety Support

Aspect 3, Sheffield

Aspect 3 comprises of 5 separate accommodation blocks containing a total of 417 student bedrooms. Intrusive investigations and subsequent remediation works were undertaken on external cladding systems. All high pressure laminate and curtain wall cladding systems were removed and replaced with non-combustible alternatives.